Squash

img-fluid

Kalabasa Fertilizer Management

  • Basal (2 days before transplanting)
  • 1st Sidedressing (when vine is 1 foot long)
  • 2nd Sidedressing (when vine is 3 feet long)
  • Chicken Manure (1kg/ m²)
  • 46-0-0 Fertilizer (150kg/ ha)
  • 0-0-60 Fertilizer (50kg/ ha)
  • 14-14-14 Fertilizer (20g/ m²)
  • Solophos (300kg/ ha)
  • 46-0-0 Fertilizer (10g/ m²)

Zucchini Fertilizer Management

  • Basal (2 days before transplanting)
  • 1st Sidedressing (10-15 days after transplanting)
  • 2nd Sidedressing (30-35 days after transplanting)
  • Foliar Fertilizer (1 week after 2nd sidedressing & weekly thereafter)
  • Chicken Manure (2kg/ m²)
  • 46-0-0 Fertilizer (150kg/ ha)
  • 0-0-60 Fertilizer (50kg/ ha)
  • 14-14-14 Fertilizer (200g/ m²)
  • Solophos (300kg/ ha)
  • 46-0-0 Fertilizer (100g/ m²)
Ramgo International
  • This field is for validation purposes and should be left unchanged.